Remedial Investigation

  • DEC Fact Sheet
  • Volume #1 - Final RI Report - Text and Tables
  • Volume #2 - Draft Figures
  • Volume #3 - Draft Appendicies A through D
  • Volume #4 - Draft Appendicies E through I

Alternatives Analysis Report

  • Alternatives Analysis Report - May 2024
  • Fact Sheet - Brownfield Cleanup Program - June 2024
  • NYSDEC Decision Document - August 2024
    • NYSDEC Decision Document Issuance Letter - August 2024

Proposed Record of Decision Amendment

  • Operable Unit 2 - February 2024

Work Plans

  • Development of Soil Cleanup Objective for Ammonia - September 2024
  • North Storm Sewer and Box Culvert By-pass Work Plan - May 2024
    • NYSDEC Letter Accepting North Storm Sewer and Box Culvert By-pass Work Plan
  • Focused Feasibility Study for Operable Unit 2 (Site 109) - January 2024
  • Pre-Design Investigation Work Plan - February 2023
    • NYSDEC Letter Accepting Pre-Design Investigation Work Plan
  • Brownfield Remedial Investigation Work Plan - October 2020
    • Responsiveness Summary
  • State Superfund Site 110 and Site 109 Focused Remedial Investigation and Feasibility Study Work Plan - July 2020
    • Field Sampling Plan
    • Quality Assurance Project Plan
    • Health and Safety Plan
    • Community Air Monitoring Plan
  • State Superfund Site 108 Remedial Investigation and Feasibility Study Final Work Plan - October 2020

Interim Remedial Measures

  • Brownfield

    • Above Ground Storage Tank ST24 Investigation Work Plan
    • Process Equipment Removal Interim Remedial Measures Work Plan
    • Backfill Interim Remedial Measure Work Plan
    • Light Oil Area IRM Sampling Work Plan
    • Light Oil Area Water Profiling Report
    • Interim Surface Materials Management IRM Work Plan (Stage 1)
    • Storm Water Pollution Prevention Plan (SWPPP)
    • Surface Water System Maintenance Work Plan
    • Site Management Work Plan, Scope No. 2
    • Mixing Pad Dewatering IRM Work Plan
    • Coal and Coke Excavation Work Plan
    • Surface Materials Management
    • Drum and Container Management IRM
    • Abandoned Pipeline IRM Work Plan
    • Replacement of Coal Yard Material IRM
    • Surface Water Findings and Recomendations
    • Interim Site Management Plan Acceptance Letter
    • Groundwater IRM Work Plan - Addendum - March 2022
    • Groundwater IRM Work Plan Acceptance Letter - March 2022
    • Source Area Solidification IRM Work Plan - October 2023
    • Carbon Availability - Breeze Testing - October 2023
    • Byproducts Area Underground Storage Tank - January 2024
    • Tar Management Addendum - January 2024
  • State Superfund Site 108

    • Pipe Rack Pipe Leak Removal Work Plan
      • NYSDEC Letter Accepting Pipe Rack Pipe Leak Removal Work Plan
    • Tank Removal Work Plan
    • Asbestos Abatement Work Plan
    • Asbestos Survey Report